chore: change deploy order. (#4441) #31
services.yml
on: push
Matrix: image-build
save-sealos
/
save-sealos
40s
resolve-modules
9s
Matrix: build-cluster-image
Matrix: golangci-lint
Annotations
5 errors
image-build (pay)
Username and password required
|
image-build (account)
The job was canceled because "pay" failed.
|
image-build (account)
The operation was canceled.
|
image-build (database)
The job was canceled because "pay" failed.
|
image-build (database)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
sealos
Expired
|
76.7 MB |
|