Skip to content

debug: more info for debian bonded on nvidia hw #500

debug: more info for debian bonded on nvidia hw

debug: more info for debian bonded on nvidia hw #500

Triggered via push May 31, 2024 19:09
Status Failure
Total duration 2m 39s
Artifacts

ci.yaml

on: push
Matrix: pytests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
pytests (3.11)
Process completed with exit code 1.
pytests (3.7)
The job was canceled because "_3_11" failed.
pytests (3.7)
Process completed with exit code 1.
pytests (3.8)
The job was canceled because "_3_11" failed.
pytests (3.8)
Process completed with exit code 1.
pytests (3.10)
The job was canceled because "_3_11" failed.
pytests (3.10)
The operation was canceled.
pytests (3.9)
The job was canceled because "_3_11" failed.
pytests (3.9)
Process completed with exit code 1.
pytests (3.12)
The job was canceled because "_3_11" failed.
pytests (3.12)
The operation was canceled.
lint
Process completed with exit code 1.